Building maintenance management preliminary finding of a case study in ICYM

Ab Wahab, Yuseni and Hasan Basari, Abd Samad (2013) Building maintenance management preliminary finding of a case study in ICYM. Middle-East Journal of Science Research, 17 (9). pp. 1260-1268. ISSN 1990-9233

[img] PDF
IDOSI_SnapshotModel.pdf - Published Version
Restricted to Registered users only

Download (798kB)

Abstract

Building Maintenance Management (BMM) is essential to prolong the building life cycle and reduce the company loss. When buildings are neglected, defects can occur which may result in extensive and unavoidable damage to the building fabric or structure. The objective of this study is to identify International College of Yayasan Melaka (ICYM) building maintenance problems. As such, the chosen building needs to be identified before the research start. The defect and the problem face will be collected and noted in a check list. This will be done by questionnaires and distributed to all service users in ICYM building management office and student hostel. Interview sessions and site visit are also conducted to understand the problem encounter. Hence, this paper is focusing on the maintenance management system which the aim is to reduce the downtime of plant items taking into account the possible impact of a failure in terms of cost. The analysis shows that the hostel building contributed to the most problematic area in ICYM. Based on the preliminary finding, it shows that there is a need to propose a systematic building maintenance management.

Item Type: Article
Uncontrolled Keywords: Building Maintenance Management, Defect and Failure
Divisions: Faculty of Information and Communication Technology > Department of Industrial Computing
Depositing User: Dr. Abd. Samad Hasan Basari
Date Deposited: 19 Mar 2014 01:48
Last Modified: 08 Jun 2023 11:45
URI: http://eprints.utem.edu.my/id/eprint/11780
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item