Makespan Minimization of Machines and Automated Guided Vehicles Schedule Using Binary Particle Swarm Optimization

Md Fauadi, Muhammad Hafidz Fazli and Murata, Tomohiro (2010) Makespan Minimization of Machines and Automated Guided Vehicles Schedule Using Binary Particle Swarm Optimization. In: International MultiConference of Engineers and Computer Scientists 2010, 17-19 March, 2010, Hong Kong.

[img] Text
Makespan Minimization of Machines and iaeng.pdf - Published Version

Download (713kB)

Abstract

An efficient and optimized Automated Guided Vehicles (AGVs) operation plays a critical role in improving the performance of a Flexible Manufacturing System (FMS). Among the main elements in the implementation of AGV is task scheduling. This is due to the fact that efficient scheduling would enable the increment of productivity and reducing delivery cost whilst optimally utilizes the entire fleet. In this research, Binary Particle Swarm Optimization (BPSO) is used to optimize simultaneous machines and AGVs scheduling process with makespan minimization function. It is proven that the method is capable to provide better solution compared to others.

Item Type: Conference or Workshop Item (Lecture)
Subjects: Q Science > QA Mathematics
Q Science > QA Mathematics > QA75 Electronic computers. Computer science
Q Science > QA Mathematics > QA76 Computer software
T Technology > TJ Mechanical engineering and machinery
Divisions: Faculty of Manufacturing Engineering > Department of Robotics and Automation
Depositing User: MUHAMMAD HAFIDZ FAZLI MD FAUADI
Date Deposited: 28 Dec 2017 08:13
Last Modified: 22 Jun 2023 14:45
URI: http://eprints.utem.edu.my/id/eprint/20223
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item