Akbar, Muhammad Rezeki and Aripriharta and Mizar, Alfian and Muladi, Muladi and Ching, Hung-Yu and Amin, Muhammad Adib (2023) Techno-economical analysis of hybrid PV system for school industry. In: 3rd IEEE International Conference in Power Engineering Applications, ICPEA 2023, 6 March 2023through 7 March 2023, Virtual, Online.
Text
Techno-economical analysis of hybrid PV system for school industry.pdf Restricted to Repository staff only Download (1MB) |
Abstract
Electrical energy is currently one of the most important needs of the community and as the most important economic resource needed in various activities. The need for electrical energy every year continues to increase. However, the rapid development of electricity consumption is not matched by the growth of power generation. To overcome these problems, alternative energy sources are needed as a substitute for coal. One of the renewable natural resources is solar energy. To harvest this energy, a device called a solar panel or photovoltaic is needed. This study discusses the design of solar power plant in PPPI Al-Ittihad using technical and economic analysis. This solar power generation system is designed to supply electricity needs to help with daily activities. The design of this solar power plant requires 10 solar modules with a capacity of 120 wp, 1 inverter with a capacity of 5 kW, and 4 units of 12 V/200 Ah batteries. The initial investment cost for this solar power generation system is Rp22,398,435. Analysis of the feasibility of investing in a solar power plant system shows a positive Net Present Value (NPV) value of Rp32,208,93095, Internal Rate of Return (IRR) 10.0171% and Profitability Index (PI) 1.001437999. The NPV, IRR, and PI values show positive values, so the investment for this solar power generation system project can be said to be feasible. As for the payback period, it is achieved in the 9th year of the project's operating period.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Uncontrolled Keywords: | Economic analysis, Payback period, Solar power plant |
Divisions: | Faculty Of Industrial And Manufacturing Technology And Engineering |
Depositing User: | Maizatul Najwa Ahmad |
Date Deposited: | 20 Sep 2024 16:03 |
Last Modified: | 20 Sep 2024 16:03 |
URI: | http://eprints.utem.edu.my/id/eprint/27887 |
Statistic Details: | View Download Statistic |
Actions (login required)
View Item |