Items where Division is "Faculty of Manufacturing Engineering > Department of Manufacturing Management" and Year is 2012
Up a level |
A. P., Puvanasvaran (2012) Enhancing Productivity Through Lean Behavior. In: Theoretical and Methodological Approaches to Social Sciences and Knowledge Management. INTECH, pp. 283-306. ISBN 978-953-51-0687-6
A. P., Puvanasvaran (2012) Evolution Sustainable Innovation Management in China. In: iDECON 2012 – International Conference on Design and Concurrent Engineering, 15 - 16 October 2012, Melaka.
A. P., Puvanasvaran (2012) Interrelationship Between Availability With Planning Factor and Mean Time Between Failures (MTBF) in Overall Equipment Effectiveness (OEE). Journal of Advanced Manufacturing Technology (JAMT) , 6 (2). pp. 29-38. ISSN 1985-3157
A. P., Puvanasvaran (2012) Overall Equipment Efficiency (Oee) Improvement Through Integrating Quality Tool: Case Study. In: iDECON 2012 – International Conference on Design and Concurrent Engineering, 15 - 16 October 2012, Melaka.
A. P., Puvanasvaran (2012) A Study on the Effect of Different Interconnection Materials (Wire and Bond Pad) on Ball Bond Strength after Temperature Cycle Stress. In: iDECON 2012 – International Conference on Design and Concurrent Engineering, 15 - 16 October 2012, Melaka.
A. P., Puvanasvaran (2012) Sustainability of Green Technology in Malaysia Industry. In: iDECON 2012 – International Conference on Design and Concurrent Engineering, 15-16 October 2012, Universiti Teknikal Malaysia Melaka (UTeM).
A. P., Puvanasvaran (2012) University-SME clusters: A research on commercialization perspective among IPTA & IPTS in Malaysia. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON TECHNOLOGY MANAGEMENT AND TECHNOPRENEURSHIP (IC-TMT) 2012, 1 (1). pp. 10-20. ISSN IC-TMT 2012
A. P., Puvanasvaran (2012) Workshop Store Room Improvement With 5s: A Case Study. In: iDECON 2012 – International Conference on Design and Concurrent Engineering, 15 - 16 October 2012, Melaka.
A. P., Puvanasvaran and M. R., Muhamad (2012) Lean principles adoption in environmental management system (EMS): A survey on ISO 14001 certified companies in Malaysia. Journal of Industrial Engineering and Management, 5 (2). pp. 406-430. ISSN 2013-8423
A. P., Puvanasvaran and M. R. , Muhamad (2012) Integration Model of ISO 14001 with Lean Principles. American Journal of Applied Sciences, 9 (12). pp. 1974-1978. ISSN 1546-9239
A. P. , Puvanasvaran (2012) Employability Skills Assessment Tool Development. International Education Studies, 5 (5). pp. 43-56. ISSN 1913-9039
A.Perumal, Puvanasvaran (2012) Lean Manufacturing -Module 5. Penerbit UTeM, UTeM.
Ahmad, NurulHuda and Kamat, Seri Rahayu (2012) CAR ACCIDENTS ANALYSIS THROUGH VIRTUAL WINDOW INTERFACE. In: iDECON 2012 – International Conference on Design and Concurrent Engineering, 15 - 16 October 2012, Melaka.
Haeryip , Sihombing (2012) An Analysis of the Customer Satisfaction: A Case Study of Bank Service. International Journal of Application or Innovation in Engineering & Management (IJAIEM), 1 (2). pp. 33-43. ISSN 2319 - 4847
Isa, Halim (2012) Development of Prolonged Standing Strain Index to Quantify Risk Levels of Standing Jobs. International Journal of Occupational Safety and Ergonomics (JOSE), 18 (1). pp. 85-96. ISSN 1080-3548
Isa, Halim (2012) Modelling and Optimization Approach of Quantitative Environmental Ergonomics in Malaysian Automotive Industry. Journal of Occupational Safety and Health, 9 (1). pp. 7-13. ISSN 1675-5456
Isa, Halim and Al Amin, Mohamed Sultan and Seri Rahayu , Kamat and Rohana, Abdullah (2012) Muscle Activity while Standing for Prolonged Time Periods in Metal Stamping Industry. In: International Conference on Design and Concurrent Engineering, 15-16 Okt 2012, Bandar Melaka, Melaka.
Isa, Halim and Rohana, Abdullah (2012) A Survey on Work-related Musculoskeletal Disorders (WMSDs) among Construction Workers. Journal of Occupational Safety and Health, 9 (1). pp. 15-19. ISSN 1675-5456
Isa, Halim (2012) Analysis of Time-to-Fatigue for Standing Jobs in Metal Stamping Industry. Advanced Materials Research, 433-44. pp. 2155-2161. ISSN 1662-8985
Isa, Halim (2012) Assessment of Muscle Fatigue Associated with Prolonged Standing in the Workplace. Safety and Health at Work, 3 (1). pp. 31-42. ISSN 2093-7911
Kamat, Seri Rahayu (2012) Strength Capabilities and Subjective Limit of Repetitive Manual Insertion Task. Scottish Journal of Arts, Social Sciences and Scientific Studies, 1 (6). pp. 2047-1278. ISSN 2047 - 1278
Mohamad, Effendi and Salleh, Mohd Rizal (2012) Simulation Study Towards Productivity Improvement for Assembly Line. Journal of Human Capital Development, 5 (2). pp. 59-69. ISSN 1985-7012
R., Thevendran and A. P. , Puvanasvaran (2012) Industrializing the University-SME Commercialization: A Conceptual Study of Commercialization Industry in Malaysia. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON TECHNOLOGY MANAGEMENT AND TECHNOPRENEURSHIP (IC-TMT) 2012, 1 (1). pp. 100-107. ISSN IC-TMT 2012
Sihombing, Haeryip and M.Y., Yuhazri and S.H., Yahaya and Z.A., Myia Yuzrina and A.Z., Ainul Azniza (2012) Revisited The Importance and Performance Analysis (IPA) and Kano Model for Customer Satisfaction Measurement. Global Engineers & Technologists Review, 2 (1). pp. 22-39. ISSN 2231-9700
Sihombing, Haeryip and M.K., Hafiz and M.Y. , Yuhazri (2012) Taguchis Quality Improvement Analysis of the SME Bread Manufacturing. Global Engineers & Technologist Review, 2 (9). pp. 6-18. ISSN 2231-9700
Sihombing, Haeryip and M.Y., Yuhazri and A.Razak, Jeefferie and P., Perumal and Akbar, Habibulah (2012) Real of Simply Assembly Line Balancing using Fact-Model. International Journal of Computer and Electrical Engineering, 4 (6). pp. 870-874. ISSN 1793-8163
Sihombing, Haeryip and M.Y., Yuhazri and S.H., Yahaya (2012) How to Measure and Identify the Ultimate Improvement Required for Customer Satisfaction. Global Engineers & Technologists Review, 2 (11). pp. 14-28. ISSN 2231-9700
Sihombing, Haeryip and Rassiah, Kannan and Ashaari, Zaini and M.Y., Yuhazri (2012) An Analysis and Development of Recycled Materials for Wood Plastic Composite Product. Elixir Mechanical Engineering, 51. pp. 10834-10840. ISSN 2229-712X
Sihombing, Haeryip and Yuhazri, Yaakob and YAHAYA, SAIFUDIN HAFIZ and Sivarao, Subramonian and Hazwan, M.A (2012) An Analysis of Quality Criteria to Determine the Improvement Priority Attributes. Universiti Teknikal Malaysia Melaka, pp. 489-493. ISBN 978-967-0257-16-7
Sihombing , Haeryip and M.Y., Yuhazri (2012) Revisited The Measurement Strategy of Public Sectors Performance Using Fitted Management. Journal of Human Capital Development, 5 (2). pp. 77-111. ISSN 1985-7012
Wan Mahmood, Wan Hasrulnizzam and Ab Rahman, Mohd Nizam and Md Deros, Baba (2012) Model Persamaan Struktural untuk Mengkaji Kesan Pengurusan Rantaian Pembekalan Hijau dalam Industri Pembuatan. Jurnal Teknologi, UTM, 59. pp. 21-27. ISSN 0127-9696
Wan Mahmood, Wan Hasrulnizzam and Ab Rahman, Mohd Nizam and Md Deros, Baba (2012) Green Supply Chain Management in Malaysian Aero Composite Industry. Jurnal Teknologi, UTM, 59. pp. 13-17. ISSN 0127-9696
Yaakob, Mohd Yuhazri and Sihombing, Haeryip and Perumal, Puvanasvaran (2012) Study of the Optimum Condition Towards the Inducing Paraffin Wax LDPE. International Journal of Engineering & Technology IJET-IJENS, 10 (4). pp. 9-12.
syed mohamed, muhammad syafiq (2012) The Influence of Different Hand Tool Designs on the Perception of Aesthetics, Ergonomics and Usability. International Journal of Business and Social Science , 3 (3). pp. 241-246. ISSN 2219-6021
syed mohamed, muhammad syafiq and ideris, harizah (2012) Managing Risks in a Manufacturing Environment : A Perspective from Reason’s Accident Causation Model. Universal Journal of Management and Social Sciences, 2 (8). pp. 38-46. ISSN 2226-6240