A Comparative Analysis of Supplier Performance Measures for Malaysian Aero Composite Manufacturing Companies: Case Study

Wan Mahmood, Wan Hasrulnizzam and Ab Rahman, Mohd Nizam and Md Deros, Baba (2011) A Comparative Analysis of Supplier Performance Measures for Malaysian Aero Composite Manufacturing Companies: Case Study. In: 15th International Conference on ISO & TQM (ICIT 15), 26-28 July 2011, Kuala Lumpur, Malaysia.

[img]
Preview
PDF
04-06.pdf - Published Version

Download (74kB)

Abstract

The aim of this paper is to study how aero composite manufacturing companies in Malaysia do performance measures. The paper outlines the method of maintaining the approved suppliers and their continuous compliance to the requirement and to ensure that only approved supplier in the approval supplier list are referred to for purchasing of product manufacturing related activities. This paper provides a rational and comparative approach for findings solutions to eliminate the cause(s) of non-conformities in order to prevent recurrence or potential non-conformities in product, process, and quality system of suppliers. This is a qualitative case study, which, therefore, limits its generalisability. However, its contextualization enables insight to be applied to the wider manufacturing environment.

Item Type: Conference or Workshop Item (Paper)
Subjects: T Technology > TS Manufactures
Divisions: Faculty of Manufacturing Engineering > Department of Manufacturing Management
Depositing User: Dr Wan Hasrulnizzam Wan Mahmood
Date Deposited: 10 Feb 2014 04:28
Last Modified: 28 May 2015 04:15
URI: http://eprints.utem.edu.my/id/eprint/11177
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item