The requirements for a dynamic bus crew scheduling system

Shibghatullah, Abdul Samad and Eldabi, Tillal and Rzevski, George (2006) The requirements for a dynamic bus crew scheduling system. In: Proceedings of the 10th International Conference on Computer-Aided Scheduling of Public Transport. 2006, 2006, Malaysia.

[img]
Preview
Text
SamadJournal2008.pdf

Download (6MB)

Abstract

Bus crew scheduling problem is a complex problem because of the large number oi variables that are needed to be considered for Optimisation, such as complexity of allocating crew shifts; rising costs of crew; and unpredictability of traffic and crew availability. There is a number of existing scheduling systems that are able to produce optimal or near optimal schedules. However, to maintain such optimality in day-to—day operations. such scheduling systems need to extend their capabilities by enabling crew reassignment, a feature that is not currently available in most automated scheduling systems. This paper looks at the unpredictability problem more closely and investigates how bus companies currently manage their schedules. The information is elicited from literature and interviews from three bus companies in London,UK. Consequently, this paper proposes a set of requirements for a dynamic crew scheduling system that is able to perform crew reassignment in real time given the occurrence of unpredictable events such as lateness for duty, sick on duty, or crew absenteeism without prior notice. The proposed approach aims to dynamically maintain optimality throughout day~to~day operations.

Item Type: Conference or Workshop Item (Paper)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Information and Communication Technology > Department of Industrial Computing
Depositing User: Dr Abdul Samad Shibghatullah
Date Deposited: 20 Nov 2014 20:37
Last Modified: 03 Jul 2023 15:58
URI: http://eprints.utem.edu.my/id/eprint/13054
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item