The Level Of Achievement Of Lean Manufacturing Implementation Status Before And After The Development Of KPI's At An Aerospace Manufacturing Company

Mohamad, Effendi and Abdullah, Rohana and Wan Mahmood, Wan Hasrulnizzam (2004) The Level Of Achievement Of Lean Manufacturing Implementation Status Before And After The Development Of KPI's At An Aerospace Manufacturing Company. In: The Seminar Kebangsaan Komunikasi Ke-2, 18-19 Dicember 2004, Pulau Langkawi, Malaysia .

[img] Text
THE LEVEL OF ACHIEVEMENT OF LEAN MANUFACTURING IMPLEMENTATION STATUS BEFORE AND AFTER THE DEVELOPMENT OF KPI'S AT AN AEROSPACE MANUFACTURING COMPANY-EFFENDI MOHAMAD-MAK 00620 RAF.pdf - Published Version

Download (4MB)

Abstract

This research study focuses on the issue of the level of achievement of Lean Manufacturing Implementation status before and after the development of Key Performance Indicators (KPIs) at an aerospace manufacturing company. The KPIs are targeted to provide this company with a good performance measurement tools in supporting the success of their Lean manufacturing journey. The assessment will be based on Red Amber Green (RAG) status. KPIs development in this research can improve of productivity and efficiency in manufacturing engineering system.

Item Type: Conference or Workshop Item (Paper)
Uncontrolled Keywords: Aeronautics, Lean manufacturing, Aerospace engineering, Production management
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Faculty of Manufacturing Engineering > Department of Manufacturing Management
Depositing User: Muhammad Afiz Ahmad
Date Deposited: 04 Dec 2017 00:43
Last Modified: 04 Dec 2017 00:44
URI: http://eprints.utem.edu.my/id/eprint/20079
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item